Skip to content

Sign In

AI Data Centers for Sale & Powered Land

Ace Miners · U.S. & Canada site directory

AI Data Centers for Sale & Powered Land

Find data center sites, land with power and MW-scale infrastructure opportunities across the United States and Canada. Compare operating mining sites for AI conversion, grid-powered development land, phased utility projects and proposed behind-the-meter generation.

Explore 31 individual site summaries. Each page explains the reported power position, land or lease structure, infrastructure and the questions to resolve before a deployment. Some offerings are development concepts or previously advertised opportunities; current availability is confirmed by inquiry.

Browse by location

Match the power position to your project

Energized or operating: evaluate current utility service, operating equipment and any conversion work. Phased development: compare contracted or proposed MW with the infrastructure and approvals required for delivery. Investment property: distinguish a leased operating asset from vacant capacity available to a new user.

For 20MW, 50MW, 100MW or larger AI data center searches, review the actual delivered-power basis. A generation headline or future expansion target is different from commissioned IT capacity. Contact Ace Miners to discuss your initial load, growth phases, preferred region and budget.

Texas data center sites & powered land

45MW

Texas 45MW Powered Land for AI Data Center Development

Phased grid power · development site

Approximately 46 acres

15MW described as available to energize; another 30MW targeted in 2027.

View TX-045: Texas site details

10MW

Texas 10MW Energized Data Center Site | AI/HPC Conversion

Operating mining site · AI conversion evaluation

Approximately 4 acres available

10MW reported energized; expansion to 30MW targeted for 2028.

View TX-010: Texas site details

20MW

Texas 20MW Energized Data Center Site on 80 Acres

Operating site · phased expansion potential

Approximately 80 acres; fee-simple ownership reported

20MW reported energized, with a proposed pathway to 74MW.

View TX-020: Texas site details

5 acres

Texas 5-Acre Powered Mining Site | AI Conversion Potential

Partly operating · capacity reconciliation required

Approximately 5 acres

Latest equipment summary describes about 1.5MW operating plus additional capacity requiring connection or a transformer.

View TX-005: Texas site details

30MW

Texas 30MW Energized Immersion Data Center | AI Retrofit

Operating immersion-cooled mining site

Approximately 3 acres; adjacent expansion subject to confirmation

30MW live capacity described in the source overview.

View TX-030: Texas site details

70MW

Texas 70MW Grid Power & Land | Natural Gas Expansion

Existing service · phased utility expansion

Approximately 187 acres described

5MW existing onsite service; a reported 70MW expansion pathway requires infrastructure work.

View TX-070: Texas site details

Oklahoma data center sites & powered land

9MW

Oklahoma 9MW Powered Land | 40 Acres & Expansion Potential

Initial distribution power · expansion study required

Approximately 40 acres included in the described offering

Approximately 9MW initial grid-power position; larger expansion requires a substation build.

View OK-009A: Oklahoma site details

9MW

Oklahoma 9MW Data Center Land with Fiber & Water Access

Utility approval and service agreement required

Approximately 40 acres available

9MW proposed utility service; customer approval and a direct service agreement required.

View OK-009B: Oklahoma site details

9MW

Oklahoma 9MW Land & Power Acquisition Opportunity

Contract load described · energization to confirm

Approximately 40 acres

9MW contract-load position described; current energization and delivery dates require confirmation.

View OK-009C: Oklahoma site details

55MW

Oklahoma 55MW Utility Power & Data Center Land Opportunity

Phased distribution power · gas expansion proposed

80+ gross acres; approximately 40–50 usable acres reported

55MW contracted utility-power position reported; approximately 20.8MW described through existing distribution.

View OK-055: Oklahoma site details

100MW

Oklahoma 197-Acre Data Center Land | Phased Power Potential

Phased development concept

Approximately 197 acres

9MW initial phase and a proposed ramp toward 100MW described; utility commitments require review.

View OK-197: Oklahoma site details

Kentucky data center sites & powered land

5MW

Kentucky 5MW Mining Site | 3MW Active & Upgrade Potential

3MW active reported · upgrade to 5MW

Approximately 3.7 acres; land included

3MW currently active reported; another 2MW depends on transformer installation and approvals.

View KY-005: Kentucky site details

3.5MW

Kentucky 3.5MW Powered Site | Modular AI Conversion Review

Partly energized · transformer-dependent expansion

Compact core parcel; adjacent land may be available separately

2MW previously reported energized; another 1.5MW depends on transformer commissioning and confirmation.

View KY-0035: Kentucky site details

6MW

Kentucky 6MW Data Center Power Opportunity | Utility Review

Proposed capacity · written utility confirmation required

Parcel and included asset scope subject to diligence

6MW proposed utility-power position; full energized capacity is not established.

View KY-006: Kentucky site details

New York data center sites & powered land

4MW

New York 4MW Powered Facility | Data Center Conversion

Partly operating · expansion requires reconciliation

Approximately 20,000 sq ft described for lease

4MW energized claimed in the latest overview; additional capacity and equipment ratings require confirmation.

View NY-004: New York site details

10MW

New York 10MW Energized Data Center Development Lease

Energized power reported · lease opportunity

More than 10 acres; lease structure

10MW energized reported in the supplied overview.

View NY-010: New York site details

Ohio data center sites & powered land

200MW

Ohio 200MW Data Center Power & Land Development Opportunity

Utility-backed development · delivery conditions apply

Approximately 14 acres

200MW grid-power opportunity described in project materials; energization remains conditional.

View OH-200: Ohio site details

Indiana data center sites & powered land

20MW

Indiana 20MW Operating Data Center Site | AI Retrofit Review

Operating mining site · utility contract reported

Approximately 4 acres; owned land described

20MW contracted capacity; recent materials report approximately 17.5MW average operating load.

View IN-020: Indiana site details

North Dakota data center sites & powered land

430MW

North Dakota Data Center Campus | Up to 430MW Power Pathway

Large-campus power allocation review

Industrial data center land within a larger energy campus

Substation design supports a pathway up to 430MW; current unallocated capacity must be confirmed.

View ND-430: North Dakota site details

Oregon data center sites & powered land

40MW

Oregon 40MW Hydro-Served Data Center Site | 20MW First Phase

Phased utility delivery

Approximately 15 acres across the described parcels

Two 20MW blocks; initial delivery is conditional on utility funding and service requirements.

View OR-040: Oregon site details

Washington data center sites & powered land

24MW

Washington 24MW IT Data Center Investment & Expansion Land

Leased investment asset · no vacant 24MW represented

Approximately 86-acre mixed campus; expansion land described

24MW IT data center capacity reported; existing facility described as fully leased.

View WA-024: Washington site details

Virginia data center sites & powered land

12MW

Virginia 12MW Industrial Campus | AI Data Center Conversion

Industrial conversion opportunity

Approximately 280-acre campus; substantial developable acreage described

12MW existing power infrastructure reported; larger future phases require utility confirmation.

View VA-012: Virginia site details

Montana data center sites & powered land

30MW

Montana Power & Data Center Campus | 30MW Grid Opportunity

Mixed generation and grid infrastructure

Approximately 150 acres described

30MW immediate grid capacity reported; further grid and generation proposals are separate.

View MT-030: Montana site details

British Columbia data center sites & powered land

100MW

British Columbia 100MW AI Data Center Development Site

Power allocation · substation required

Approximately 20 acres; long-term renewable lease

100MW allocation reported at transmission voltage; facility energization requires a new substation.

View BC-100: British Columbia site details

Western Canada data center sites & powered land

375MW

Western Canada 375MW Powered Land | Proposed AI/HPC Campus

Proposed BTM generation · phased delivery

Proposed leased parcels within a larger energy park

375MW proposed across five 75MW delivery islands; no current energized allocation represented.

View CA-375: Western Canada site details

Earlier advertised opportunities — availability review

The following listings remain available for inquiry, with current availability and technical details requiring an update. They are separated from newer source summaries so buyers can assess the status of each opportunity.

50MW

Texas 50MW Grid Power Site with Fiber | Land Lease

Previously advertised · availability review

Approximately 9 acres; lease footprint

50MW advertised in the existing listing; current energization requires confirmation.

View TX-050G: Texas site details

150MW

Texas 150+MW Power & Land Opportunity | Availability Review

Previously advertised · availability review

100+ acres previously advertised

150+MW headline in existing materials; grid and gas components require separate confirmation.

View TX-150: Texas site details

24MW

Texas 24MW Power Site & Land | Data Center Development Review

Previously advertised · availability review

Land ownership described; acreage to confirm

24MW advertised; current service arrangement and energized load require confirmation.

View TX-024: Texas site details

6MW

Texas 6MW Power Site with PPA | Data Center Land

Previously advertised · PPA review required

9+ acres previously advertised

6MW advertised with a reported PPA; delivery and transfer conditions require confirmation.

View TX-006: Texas site details

4.5MW

Georgia 4.5MW Mining Infrastructure | AI Retrofit Opportunity

Previously advertised · operating status review

5+ acres previously advertised

4.5MW total advertised with a 3MW ready portion described; current load to confirm.

View GA-0045: Georgia site details

50MW

Texas 50MW Off-Grid Natural Gas & Land Lease Opportunity

Previously advertised · generation review

Proportional land lease described

50MW program advertised with a 20MW minimum allocation; commissioned generation not established.

View TX-050B: Texas site details

Request a data center site shortlist

Share the regions you would consider, your initial and ultimate MW requirement, required energization date, purchase or lease preference and intended AI, HPC or other compute workload. Include acreage, fiber, cooling and redundancy requirements so we can discuss relevant sites.

Questions from data center buyers

Are all of these operating AI data centers?

The directory includes operating mining sites, development land, utility-power opportunities, proposed generation programs and an investment asset. Each site page identifies its stage. AI/HPC suitability requires a project-specific technical review.

Does the listed MW mean power is available today?

Some materials describe energized service; others describe a contract position, future phase or proposed generation. Read the power position on the individual page and request current utility confirmation before relying on a delivery date.

Can I buy land or lease a powered site?

The opportunities use different structures, including land acquisition, ground lease, facility lease and proposed power agreements. The individual pages identify the described tenure, with final commercial terms available by inquiry.

What should a 100MW AI campus buyer compare?

Compare firm delivered power and usable IT load, energization milestones, buildable acreage, fiber route diversity, cooling and water, permits, expansion rights and total deployment cost. A large advertised MW figure alone does not establish project readiness.

Why are exact locations and owner names omitted?

These public summaries provide enough information for initial site selection while protecting sensitive project information. Detailed location and supporting documents may be provided through a controlled diligence process where available.

Research AI infrastructure before acquiring a site

Site details reflect supplied materials and may change. Availability, power rights, energization, land tenure, equipment, permitting and commercial terms require current confirmation. No aggregate MW total is represented as vacant, contracted or energized portfolio capacity.

Back to top
Home Shop
Wishlist
Log in
×