British Columbia · Reference BC-100
British Columbia 100MW AI Data Center Development Site
A large-scale British Columbia powered-land opportunity for AI, HPC and GPU infrastructure development. The offering combines a reported 100MW power allocation with a long-term land lease and access to fiber and water.
Power allocation · substation requiredPower, land and infrastructure
- Region
- British Columbia
- Power position
- 100MW allocation reported at transmission voltage; facility energization requires a new substation.
- Land / tenure
- Approximately 20 acres; long-term renewable lease
- Infrastructure
- Fiber and water access reported. A 67-year renewable lease is described in the latest summary.
- Pricing & terms
- Request current commercial terms from Ace Miners.
Development and deployment
This is a development opportunity with power at the upstream delivery voltage. A buyer-installed step-down substation and customer-side electrical facilities are required before a completed data center can operate. The land remains under lease rather than being conveyed as fee-simple property.
What buyers should verify
Confirm the allocation and service agreements, substation specifications, usable footprint, lease assignment, development approvals and fiber routes. Additional acreage may be explored separately; it is not included in the stated footprint.
Request a confidential site package
Quote reference BC-100 and share your target MW, required delivery date, preferred transaction structure and intended workload. Ace Miners can discuss current availability and the next step for detailed information. Location, identity and project documents are provided through a controlled process where available.
Public overview based on supplied site materials. Current availability, utility rights, delivery dates and asset inclusions require confirmation. Facility MW, generation capacity and usable IT MW are different measures. AI/HPC suitability depends on project-specific engineering.
