Texas · Reference TX-020
Texas 20MW Energized Data Center Site on 80 Acres
A Texas operating data center and powered-land opportunity with a reported 20MW energized base and substantial acreage for expansion planning. Existing air-cooled modular infrastructure can be assessed for continued operations or redevelopment.
Operating site · phased expansion potentialPower, land and infrastructure
- Region
- Texas
- Power position
- 20MW reported energized, with a proposed pathway to 74MW.
- Land / tenure
- Approximately 80 acres; fee-simple ownership reported
- Infrastructure
- Operating modular facilities, transmission access and natural-gas access described.
- Pricing & terms
- Request current commercial terms from Ace Miners.
Development and deployment
Seller materials describe six operating modular facilities and a staged expansion program. The reported pathway reaches 60MW in 2029 and 74MW in 2030, subject to utility commitments, equipment procurement and construction. The expansion figures are prospective rather than current energized load.
What buyers should verify
Confirm current power rights, the expansion study and substation scope, included assets, water rights, fiber service and gas-generation feasibility. AI/HPC redevelopment requires a workload-specific review of cooling, resilience and network architecture.
Request a confidential site package
Quote reference TX-020 and share your target MW, required delivery date, preferred transaction structure and intended workload. Ace Miners can discuss current availability and the next step for detailed information. Location, identity and project documents are provided through a controlled process where available.
Public overview based on supplied site materials. Current availability, utility rights, delivery dates and asset inclusions require confirmation. Facility MW, generation capacity and usable IT MW are different measures. AI/HPC suitability depends on project-specific engineering.
