Oklahoma · Reference OK-197
Oklahoma 197-Acre Data Center Land | Phased Power Potential
A large Oklahoma industrial land opportunity presented for phased data center development. The supplied package describes an initial 9MW load concept and a longer-term 100MW master-plan target.
Phased development conceptPower, land and infrastructure
- Region
- Oklahoma
- Power position
- 9MW initial phase and a proposed ramp toward 100MW described; utility commitments require review.
- Land / tenure
- Approximately 197 acres
- Infrastructure
- Industrial land, nearby substation and active gas lines described.
- Pricing & terms
- Request current commercial terms from Ace Miners.
Development and deployment
Nearby electrical infrastructure and onsite gas access support a site-selection review, but proximity does not itself establish deliverable capacity. The stated power ramp is a development roadmap rather than a guarantee of contracted or energized service at every phase.
What buyers should verify
Confirm land-use entitlements, utility studies and agreements, buildable acreage, environmental conditions, fiber and water. Request a phase-by-phase schedule and cost allocation before assigning MW to an acquisition or deployment model.
Request a confidential site package
Quote reference OK-197 and share your target MW, required delivery date, preferred transaction structure and intended workload. Ace Miners can discuss current availability and the next step for detailed information. Location, identity and project documents are provided through a controlled process where available.
Public overview based on supplied site materials. Current availability, utility rights, delivery dates and asset inclusions require confirmation. Facility MW, generation capacity and usable IT MW are different measures. AI/HPC suitability depends on project-specific engineering.