Indiana · Reference IN-020
Indiana 20MW Operating Data Center Site | AI Retrofit Review
An Indiana operating mining campus with a reported 20MW utility contract and an established electrical infrastructure base. The opportunity may suit buyers evaluating existing digital infrastructure for continued operation or a targeted AI/HPC retrofit.
Operating mining site · utility contract reportedPower, land and infrastructure
- Region
- Indiana
- Power position
- 20MW contracted capacity; recent materials report approximately 17.5MW average operating load.
- Land / tenure
- Approximately 4 acres; owned land described
- Infrastructure
- Existing transformers, modular pods, switchgear and primary-metered service.
- Pricing & terms
- Request current commercial terms from Ace Miners.
Development and deployment
The source summary describes an operating history, multiple modular pods and medium- and low-voltage equipment. Current connectivity is described separately from a proposed high-bandwidth carrier upgrade. A priced fiber upgrade path is not the same as installed AI-scale network service.
What buyers should verify
Review the utility contract, historical demand, equipment condition, transfer requirements and current demand-response obligations. Confirm the delivery scope and schedule for diverse high-bandwidth fiber, and evaluate cooling and redundancy against the proposed AI workload.
Request a confidential site package
Quote reference IN-020 and share your target MW, required delivery date, preferred transaction structure and intended workload. Ace Miners can discuss current availability and the next step for detailed information. Location, identity and project documents are provided through a controlled process where available.
Public overview based on supplied site materials. Current availability, utility rights, delivery dates and asset inclusions require confirmation. Facility MW, generation capacity and usable IT MW are different measures. AI/HPC suitability depends on project-specific engineering.
