New York 4MW Powered Facility | Data Center Conversion
A New York mining-facility opportunity with leased indoor space, existing electrical distribution and a stated energized-power base. The facility may be evaluated for continued mining or a selective data center conversion.
Partly operating · expansion requires reconciliationPower, land and infrastructure
- Region
- New York
- Power position
- 4MW energized claimed in the latest overview; additional capacity and equipment ratings require confirmation.
- Land / tenure
- Approximately 20,000 sq ft described for lease
- Infrastructure
- Redundant medium-voltage feeders, primary metering and a customer-owned substation described.
- Pricing & terms
- Request current commercial terms from Ace Miners.
Development and deployment
The materials describe a customer-owned substation and staged modular equipment. The stated additional 3MW cannot be assumed to be simultaneously deliverable from the existing configuration; transformer ratings, utility allocation and operating conditions need reconciliation.
What buyers should verify
Verify current service and actual operating load, lease extension rights, network redundancy and the conversion footprint. Demand-response scenarios in earlier materials involve curtailment and should not be treated as an uninterrupted AI power tariff.
Request a confidential site package
Quote reference NY-004 and share your target MW, required delivery date, preferred transaction structure and intended workload. Ace Miners can discuss current availability and the next step for detailed information. Location, identity and project documents are provided through a controlled process where available.
Public overview based on supplied site materials. Current availability, utility rights, delivery dates and asset inclusions require confirmation. Facility MW, generation capacity and usable IT MW are different measures. AI/HPC suitability depends on project-specific engineering.