Montana · Reference MT-030
Montana Power & Data Center Campus | 30MW Grid Opportunity
A Montana energy and data center campus for buyers evaluating a combination of land, electrical infrastructure and generation redevelopment. The latest client overview reports a 30MW grid-power position alongside existing generation and computing assets.
Mixed generation and grid infrastructurePower, land and infrastructure
- Region
- Montana
- Power position
- 30MW immediate grid capacity reported; further grid and generation proposals are separate.
- Land / tenure
- Approximately 150 acres described
- Infrastructure
- Existing generation asset, air-cooled data center infrastructure and water access described.
- Pricing & terms
- Request current commercial terms from Ace Miners.
Development and deployment
The supplied materials contain separate figures for grid service, generation nameplate capacity and historical air-cooled infrastructure. These figures are not additive without confirmation of current plant condition and simultaneous operation. A natural-gas conversion is a proposed project requiring engineering and approvals.
What buyers should verify
Confirm current grid delivery, generation status, environmental obligations, gas supply, water rights and electrical asset condition. Establish the capacity and cost of an AI retrofit independently of legacy mining equipment ratings.
Request a confidential site package
Quote reference MT-030 and share your target MW, required delivery date, preferred transaction structure and intended workload. Ace Miners can discuss current availability and the next step for detailed information. Location, identity and project documents are provided through a controlled process where available.
Public overview based on supplied site materials. Current availability, utility rights, delivery dates and asset inclusions require confirmation. Facility MW, generation capacity and usable IT MW are different measures. AI/HPC suitability depends on project-specific engineering.