Virginia · Reference VA-012
Virginia 12MW Industrial Campus | AI Data Center Conversion
A Virginia industrial campus with heavy-power infrastructure and substantial building space for buyers considering AI/HPC conversion. The source offering describes configurations approaching 925,000 sq ft within a large industrial landholding.
Industrial conversion opportunityPower, land and infrastructure
- Region
- Virginia
- Power position
- 12MW existing power infrastructure reported; larger future phases require utility confirmation.
- Land / tenure
- Approximately 280-acre campus; substantial developable acreage described
- Infrastructure
- Large industrial building footprint, onsite transformers, water, sewer and gas service.
- Pricing & terms
- Request current commercial terms from Ace Miners.
Development and deployment
Existing industrial power and building capacity offer a different starting point from a greenfield parcel. The marketing roadmap describes a future 40MW stage and potentially 100+MW later, but these stages require current utility commitments and project-specific engineering.
What buyers should verify
Assess building configuration, structural loading, fiber, cooling and electrical resilience for the proposed compute use. Verify the actual usable power, developable acreage, water allocation, permits and the scope of the acquisition or occupancy arrangement.
Request a confidential site package
Quote reference VA-012 and share your target MW, required delivery date, preferred transaction structure and intended workload. Ace Miners can discuss current availability and the next step for detailed information. Location, identity and project documents are provided through a controlled process where available.
Public overview based on supplied site materials. Current availability, utility rights, delivery dates and asset inclusions require confirmation. Facility MW, generation capacity and usable IT MW are different measures. AI/HPC suitability depends on project-specific engineering.
