A North Dakota energy-campus opportunity for large-scale data center site selection. The supplied developer deck describes behind-the-meter power and a substation designed for up to 430MW of onsite load.
Large-campus power allocation reviewPower, land and infrastructure
- Region
- North Dakota
- Power position
- Substation design supports a pathway up to 430MW; current unallocated capacity must be confirmed.
- Land / tenure
- Industrial data center land within a larger energy campus
- Infrastructure
- Existing generation, transmission and industrial-zoned land described.
- Pricing & terms
- Request current commercial terms from Ace Miners.
Development and deployment
Source materials and later discussions use different initial MW allocations and ramp schedules. This public page does not claim that 430MW is vacant or immediately energized for a new buyer. The usable allocation and delivery program must be established for the specific proposed project.
What buyers should verify
Confirm the offered land footprint, current uncommitted power, PPA structure, curtailment obligations and delivery milestones. Review grid interface, backup generation, cooling water, fiber and applicable approvals against the buyer's reliability requirements.
Request a confidential site package
Quote reference ND-430 and share your target MW, required delivery date, preferred transaction structure and intended workload. Ace Miners can discuss current availability and the next step for detailed information. Location, identity and project documents are provided through a controlled process where available.
Public overview based on supplied site materials. Current availability, utility rights, delivery dates and asset inclusions require confirmation. Facility MW, generation capacity and usable IT MW are different measures. AI/HPC suitability depends on project-specific engineering.